Thursday, March 18, 2010
High Tunnel-USDA High Tunnel Project
Cold frames come complete with anchors, bows, 1 purlin*, corner bracing, and hardware. JLD-cold frames 18’, 20’, 22’, 28’ and 30’ bows are 1-5/8” tubing. Smaller sizes (12’, 14’, and 16’) are 1-3/8” tubing. Film, film Klip, or any operating equipment is sold separately. *For cold frames 20’ and larger 3 purlins are provided.
Subscribe to:
Posts (Atom)